Answer Key: Self-Test D-2.2
- d. Horizontal or vertical flow up position
- a. Low velocity
- b. Horizontal
- b. 6 diameters
- c. Vertical directly below the actuator
- d. Stop and waste valve
- b. Horizontal
- c. Within the top 150 mm (6 in.) of the tank
- a. 3 pipe diameters upstream