Self-Test D-3.3 Select Fittings
Complete Self-Test D-3.3 and check your answers.
- Complete the materials list sheet provided for the fittings shown in Figure 1 and then check your answers. Recall that your goal is to be able to identify and name fittings correctly, and to be able to compile a basic material list.

The fittings in Figure 1 are identified as numbers 1 to 13. Write these numbers in the appropriate space in the “No.” column, then fill in the rest of the table.
| Job # | No. | Quantity | Fitting Description |
| ABS DWV | |||
| Sweat Copper | |||
| Iron Pipe | |||
- Identify the fittings in Figure 2 and complete the materials list.

The fittings in Figure 2 are 3 in. cast iron drainage.
| Job # | No. | Quantity | Fitting Description |
| Drainage | 1 | ||
| 2 | |||
| 3 | |||
| 4 |
- Identify the fittings in Figure 3 and complete the materials list.

The fittings in Figure 3 are identified as numbers 1 to 9. Write these numbers in the spaces in the No. column, then fill in the rest of the table.
|
Job # |
No. |
Quantity |
Fitting Description |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Identify the fittings in Figure 4 and complete the materials list.

The fittings in Figure 4 are identified as numbers 1 to 4. Write these numbers in the spaces in the No. column, then fill in the rest of the table.
|
Job # |
No. |
Quantity |
Fitting Description |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Identify the fittings in Figure 5 and complete the materials list.

The fittings in Figure 5 are identified as numbers 1 to 5. Write these numbers in the spaces in the No. column, then fill in the rest of the table.
|
Job # |
No. |
Quantity |
Fitting Description |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Answer Key: Self-Test D-3.3 is on the next page.